Cahill recently installed phase 2 of Trevone House for the Royal Grammar School Guildford, a steel link bridge with a powdercoated finish. Works at RGS have consisted of the supply and erection of circa 200T of structural steel to form Trevone House with the placement of all steel decking and precast stairs as well as the design, fabrication and installation of the bespoke 18m pedestrian link bridge.
UK Specialists in Structural Steelwork